Friday, May 28, 2010
New Business Immigrant Mentorship Program
For more information click here.
Friday, May 14, 2010
Patience, Cooperation and Flexibility Requested
Motorists, pedestrians and cyclists are being provided a number of commuting alternatives designed to reduce traffic congestion due to construction on the Saint John Harbour Bridge.
Bridge traffic will be reduced to two lanes and the section of Harbour Passage that borders Long Wharf, Hilyard Street and the HMCS Brunswicker will be closed beginning May 15 and throughout the summer and fall.
“The work on the bridge is significant and vital to the transportation network in the City,” said Ivan Court, Mayor of Saint John. “Crews will use hydro-demolition, high pressure water to remove layers of concrete from the bridge, lane by lane. Public safety is of the utmost importance. The area will be dangerous during construction.”
“Inconveniences are unavoidable, I ask residents for their patience, cooperation and flexibility during this construction period. It has taken some time to ensure what we are suggesting is safe and viable and that emergency officials are onboard,” said Court. Officials with the Saint John Harbour Bridge Authority, NB Southern Railway, Saint John EMO, Saint John Police Force, Public Safety Communications Centre, the Saint John Fire Department, Saint John Transit, the Saint John Parking Commission and members of the City’s traffic division have been collaborating on the measures.
The affected area around Harbour Passage will be fenced during the construction and pedestrians are warned to heed the signage and fences. Pedestrians are warned not to use the railways tracks.
Alternate route designated for pedestrians
City officials are recommending that pedestrians use the North side of Main Street and to continue across the North side of the Viaduct, where there is a side walk. The route is accessible and the City will be repainting lines and adding additional traffic signage. The route will also be marked with a dashed red line and signage indicating the alternate route will be posted. Pedestrians are reminded to watch for approaching vehicles when using crosswalks.
The City is not able to make alternate arrangements for cyclists. Cyclists are encouraged to use Douglas Avenue and Main Street during the construction period. Cyclists and motorists are asked to practice safe driving and to keep an eye out for each other.
#15 Harbour Express bus will have priority access to the Bridge
Motorists exiting Highway 1 at the Red Rose Tea building will not be able to turn left onto Union Street. That left turn has been identified by Bridge officials as the main cause of traffic tie-ups. Temporary barriers will be up on Monday as a trial, separating the left lane from regular traffic prior to the exit.
City staff would be installing concrete Jersey barriers at a later date should the trial be successful.
Motorists are instead asked to choose one of a number of alternate routes and provide additional time for travel.
Owners of the Bowlarama on Lancaster Avenue have agreed to make parking in their back lot free for those who would like to take Saint John Transit from the west side. Two transit stops are within easy walking distance of the lot: Simms Corner, Uptown via the Reversing Falls Bridge; and Dunn Avenue where commuters can catch the Harbour Express route (15). This route will have priority access to the bridge on its morning runs.
“Parcobus” the in-city park and ride program, has a lot at 10 Stinson Drive – Lorneville Industrial Park. Motorists can take transit into the city or use the lot as a drop off point for ride sharing.
Commuters from all areas are encouraged to rideshare to alleviate congestion. The Saint John Parking Commission has a ride sharing website where commuters can sign up to find ride sharing partners in their area. Visit http://www.shareyourride.ca/
Employers are asked to consider offering employees a “flex Schedule” around peak bridge access times (7:45am-8:45am and 4-5:30pm).
Fort LaTour will be available from the Long Wharf side only for the Reunion 2010, an outdoor summer concert series part of the City’s 225 celebrations, to be held on August 6 and 7.
Harbour Passage will open at the end of the construction season but close again in the 2011 season when the bridge refurbishment project resumes.
Other construction projects that will affect traffic
In addition to the refurbishment work scheduled for Saint John Harbour Bridge, there are many other ongoing and planned construction projects in and around the City that will impact the transportation network and traffic flows this construction season. Construction of the One Mile House overpass continues and will affect Route 1 and there are major projects on Rothesay Road, Bayside Dive, City Road, Station Street, Ocean Westway, and Market Place among others. Representatives of local road authorities - NB Department of Highways, the City of Saint John Police Force and Municipal Operations and Engineering, Harbour Bridge Authority and Town of Rothesay continue to meet to coordinate plans for the summer. Ongoing dialogue continues and a coordinated public information program will be maintained throughout the construction season as projects are carried out.
Message from the Department of Transportation
The Department of Transportation advises that Exit 125 for Crown Street in Saint John will be closed permanently on Tuesday May 18th. Motorists will be re-directed to a new ramp leading to Allison Road. This change in traffic pattern is part of province’s One Mile House Interchange project.
Please note that Route 1 westbound will be reduced to one lane in the construction area until approximately the end of June. Motorists should expect traffic delays, adjust their travel times and reduce their speed in the construction zone.
To view original press release click here.
Monday, May 10, 2010
Invitation to attend an address by Dr. Tony Bates
From: Robert MacKinnon, Vice-President, UNB Saint John
Dr. Tony Bates will be speaking at UNB Saint John on Tuesday, May 11 at 12:30 p.m. in the Ganong Hall Lecture Theatre. Dr. Bates is part of the ongoing speaker series at UNB as part of our strategic planning initiative.
Tony Bates specializes in e-learning in higher education. His blog on resources for e-learning receives more than 10,000 hits a month. He has written nine books on distance education and learning technologies, and has consulted in more than 35 countries. Clients include the World Bank, OECD, UNESCO, ministries of education in several countries, state higher education commissions in the USA, Volkswagen AutoUni, the Open Universities of Catalonia and Portugal, the Government of Alberta, and Southern Alberta Institute of Technology.
Due to rising interest from people outside of UNB, we have decided to open this presentation up to the external community, as well. Please forward this invitation to anyone you feel would be interested. Those who are interested should RSVP directly to Melissa Dawe (mdawe@unb.ca). Come and join me for an afternoon of refreshments and enlightenment about the vast world of e-learning.
Wednesday, May 5, 2010
191st Saint John Board of Trade Annual General Meeting
At the luncheon, Kathryn Craig stepped down and J. Michael Murphy, Commercial Account Manager with the Bank of Montreal was sworn in as the new Chair of the Saint John Board of Trade, giving a speech outlining the Board's priorities for the 2010-2011 year. Also at the luncheon Ms. Craig was presented with the traditional gift of a Josh Beutel caricature highlighting her year as Chair.
Thursday, April 29, 2010
Thursday, April 15, 2010
Energy Forum May 10-11, 2010
Thursday, April 8, 2010
Province signs $580-million Route 1 highway agreement
Premier Shawn Graham and Transportation Minister Denis Landry made the announcement today during the signing ceremony for the Route 1 Gateway Project. They were joined by business and community leaders from across Southern New Brunswick.
Transfield Dexter Gateway Services Ltd. will be responsible for the operation, maintenance and repair of 235 km of highway between St. Stephen and River Glade, excluding the Saint John Harbour Bridge, until 2040. Once construction is complete, the provincial government will pay an annual fee of $19.8 million, adjusted for inflation, to the company.
"The Saint John-St. Stephen section of Route 1 is a key component of the Atlantic Gateway and essential for the safe and efficient movement of people and goods between Atlantic Canada and New England," said Graham. "As was committed to in our Charter for Change, this government promised to complete Route 1 as a four-lane highway. We have taken a further step by making major enhancements to the traffic flow between Rothesay and Saint John, as well as other improvements along the existing Route 1 highway."
Graham highlighted the construction schedule that will see all work completed by July 2013.
- Dexter Developer General Partnership has already started pre-construction and design activities.
- Construction at culvert installations and many bridge structures will begin in early summer.
- Reconfiguration of the Route 1/Route 7 Interchange will begin this fall.
- Widening of the MacKay Highway will begin in June 2011.
The Route 1 Gateway Project also includes major upgrades at the Digdeguash River, Magaguadavic River, Letang River, Pocologan River, New River and Lepreau River crossings along with the installation of new guardrails on a number of bridges and overpasses along the Route 1 corridor.
The Dexter Developer General Partnership is assuming the risks of delivering the highway by July 31, 2013 for the set price and for operating, maintaining and repairing it for the contracted period.
"The Route 1 Gateway is an important infrastructure project for the province and Atlantic Canada," said Eric Desbiens, senior vice president, Municipal Group of Companies and Dexter. "At Dexter, we build, maintain and operate safe roads that provide for reliable travelling for the motoring public. We are pleased to be part of this exciting project."
The Route 1 Gateway Project is jointly funded by the governments of New Brunswick and Canada. Further information is online.
To view the government news release click here.
